Recent Projects
A Range Of Projects Completed By ONJ Services Team
Platform Installation
Challenge: The client required a compact, compliant platform for new heavy machinery in a limited space.
Solution: ONJ Services installed a robust, space-efficient platform with safety features and minimal disruption.
Outcome: Enhanced efficiency and compliance with regulations, with seamless system integration and negligible downtime.
Client Feedback: The client commended ONJ Services for timely, high quality installation that boost production.
Spiral Freezer
Challenge: The client, a food processing company, experienced excessive vibration and frequent breakdowns in their spiral freezer due to the use of low-quality fans and motors
Solution: ONJ Services replaced the cheap, problematic components with high-quality, durable fans and motors designed to minimize vibration and enhance performance.
Outcome: The upgraded components reduced vibration, improved the spiral freezer’s efficiency, andminimized downtime, leading to more consistent and reliable operations.
Client Feedback: The client praised ONJ Services for providing a robust solution that eliminated vibration issues and significantly improved the freezer’sperformance and reliability.
Mechanical Louver Installation
Challenge: The client needed an efficient ventilation system in a confined kitchen space to meet health regulations and improve air quality.
Solution: ONJ Services designed and installed a space-saving, high-efficiency mechanical louver system to enhance airflow and control temperature.
Outcome: The new system improved air quality and temperature control, ensuring regulatory compliance and operational continuity without downtime.
Client Feedback: The client commended ONJ Services for delivering a high-quality, cost-effective solution that significantly improved kitchen conditions and efficiency.
Automate New Feed Lines and New Gantry
Location: Altona
Description: Automate new feed lines into mixing tanks and build new gantry
Features:
- Supply and install 2” feed lines – 316 stainless steel throughout
- Relocate pneumatic shut off valves
- Increas feed capacity into mixing tanks
Scope: Design, Install & Commission
Install & Commission New Doy Pack Line
Location: Altona
Description: Install & Commission New Doy Pack Line
Features:
- Build and Design Control panel
- New cable tray and control wiring
- Wire all Motors and VSD’s
- Pneumatic Supply
- Program and commission
Scope: Design, Construct, PLC Programming and Commissioning
Wire New Glycol System for Thermoformers
Location: Melton
Description: Wire New Glycol System for High Speed Thermoformers
Features:
- Engineer and Design wiring system
- Design and wire new control panels
- Install field wiring to evaporative fans
- Integrate PLC and VSD for new glycol compressors
Scope: Design, Wire, Programming and Commission
Wire and Commision Raw Material Machines
Location: Campbellfield
Description: Wire and commission 2 x Raw material blending machines
Features:
- Build and Design Control panel
- Design and Install Safety system to CAT 4
- New cable tray and control wiring
- Wire all Motors and VSD’s
Scope: Programming and Commission